AltaPro_Logo_UpdatedTagline_V2

EV Charger Projects

AltaPro will provide for all of your electrical contracting needs.

Apex 2 EV Installation

Type of Charger

Level of Charger

Number of Charging Stations

AC Dandy

Level 2

4 Dual Chargers

Project Details

AltaPro Electric served as the design-build contractor for a 316,727 square foot light industrial building, where we supplied and installed four dual Level 2 EV chargers. Our responsibilities included the complete electrical design and installation, ensuring the incoming service and distribution equipment were properly sized to feed the EV chargers.

Our team managed every aspect of the EV charging installation, from designing the system to the final implementation, ensuring a seamless integration of the chargers into the facility. This project underscores AltaPro Electric's expertise in delivering comprehensive and reliable EV charging solutions for large-scale industrial buildings.

Sturgeon County EV Installation

Type of Charger

Level of Charger

Number of Charging Stations

Flo EV

Level 3, 2

2 Dual Chargers

Project Details

AltaPro Electric recently installed a FLO Level 2 charger and a FLO Level 3 charger, provided by the client. The project required the installation of transformers for both chargers, running conduit, pulling wire, and installing new breakers and disconnects. Our team also had to cut asphalt, perform hydrovac excavation, and repave the area. Additionally, we collaborated with Fortis on the design of the concrete pad to ensure proper placement and routing of our conduits.

This project demonstrates our ability to handle complex installations with multiple components and coordination requirements. From transformer installation and wiring to asphalt cutting and working with utility providers, AltaPro Electric ensured that the entire process was completed efficiently and to the highest standards. The successful installation of the FLO chargers provides a robust and reliable EV charging solution for our client.

Fortis EV Installation

Type of Charger

Level of Charger

Number of Charging Stations

Flo EV

Level 2

2 Dual Chargers

Project Details

AltaPro Electric recently completed the installation of two FLO Curb Side Level 2 chargers, each featuring two charging units. This project involved trenching from a nearby electrical panel to the location of the chargers. We installed pre-cast bases and pre-cast bollards to ensure the chargers were securely and properly positioned. Our team also pulled the necessary wiring, terminated connections, and commissioned the units, ensuring they were fully operational and ready for use.

This project highlights our commitment to delivering high-quality EV charging solutions. From the initial trenching and base installation to the final wiring and commissioning, AltaPro Electric ensured that every step was executed with precision and professionalism. The result is a reliable and efficient charging solution that meets the needs of the community.

CONTACT US

AltaPro can help get your project off the ground.